Eirich Mixer Install, Chesterfield

Project Overview

Dynamo Engineering are pleased to announce the successful completion of the new R24 Eirich Mixer installation works for a ceramic powder processing plant in Chesterfield.

Main Contractor: Dynamo Engineering

The project involved the removal and replacement of the Eirich Mixer system, with a capital expense of over £300k. The benefit of the new system was to increase production capacity. A new loading conveyor and skip hoist system was installed to replace the Tote Bin winch system. This system allowed for safer transferring of the product to the new Eirich Mixer. Integrated within the mixer and loading system is a dust extraction system, further enhancing the working environment.

Project Description